Technologist Mag
  • Home
  • Tech News
  • AI
  • Apps
  • Gadgets
  • Gaming
  • Guides
  • Laptops
  • Mobiles
  • Wearables
  • More
    • Web Stories
    • Trending
    • Press Release

Subscribe to Updates

Get the latest tech news and updates directly to your inbox.

What's On

Kentucky’s Bitcoin Boom Has Gone Bust

23 May 2025

Microsoft Build summary: 4 big announcements you’ll want to know

23 May 2025

Elden Ring Live-Action Movie In The Works With Ex Machina, Annihilation Director Alex Garland

23 May 2025

Acer Swift Neo WIth Intel Core Ultra 5, Up to 32GB RAM Launched in India: Price, Specifications

23 May 2025

Xiaomi XRING O1 Die Shot Reveals Details of 10-Core CPU, 6-Core NPU and More

23 May 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Technologist Mag
SUBSCRIBE
  • Home
  • Tech News
  • AI
  • Apps
  • Gadgets
  • Gaming
  • Guides
  • Laptops
  • Mobiles
  • Wearables
  • More
    • Web Stories
    • Trending
    • Press Release
Technologist Mag
Home » Fire Breaks Out at a Data Center Leased by Elon Musk’s X
Tech News

Fire Breaks Out at a Data Center Leased by Elon Musk’s X

By technologistmag.com22 May 20253 Mins Read
Share
Facebook Twitter Reddit Telegram Pinterest Email

A fire broke out Thursday morning at a data center in Hillsboro, Oregon leased by Elon Musk’s X, forcing an extended response from emergency crews, according to multiple sources who spoke to WIRED. The sources required anonymity as they aren’t authorized to speak publicly about the company.

Firefighters arrived at the Hillsboro Technology Park, in a suburb west of Portland, at 10:21 am, according to Hillsboro Fire and Rescue spokesperson Piseth Pich. They found a room with batteries that were deemed to be involved in the fire. Pich noted that the fire had not spread to other parts of the building, but said the room in question was heavy with smoke. At the time of writing, the crew was still on the scene.

X did not immediately respond to a request for comment from WIRED. It could not be learned whether server operations at the data center had been affected by the incident.

Before Elon Musk bought X, the company had three data centers in Sacramento, Portland, and Atlanta. This ensured that if one data center went down, traffic could be shifted to the other two—and split so no single data center was overwhelmed.

Around Christmas Eve 2022, Musk shut down X’s data center in Sacramento in an effort to cut costs. The company experienced a major outage in the wake of the shutdown. Over the next six months, the company moved more than 2,573 server racks from the Sacramento facility to data centers in Portland and Atlanta, according to internal documents. In the Portland area, X appears to lease space from a building that has been linked to Digital Realty, one of the world’s largest developers of data centers. Digital Realty provides varying levels of operating support at its sites, which can have one or more tenants. It’s unclear if X shares this facility with other companies. Digital Realty did not immediately respond to a request for comment.

X’s parent company, xAI, has come under fire in recent months for its rapid expansion of power capacity at a new data center in Memphis, which opened last year. That facility, which Musk named Colossus, was built up at a breakneck speed to train xAI’s Grok and other AI tools. The company installed more than 30 methane-powered gas turbines, but because the turbines are temporary, a federal permit for pollution control isn’t required, which appears to exploit a loophole in the Clean Air Act. The facility has drawn widespread criticism from surrounding Black and brown communities, who are already exposed to a large amount of air pollution and industrial emissions from other facilities in the area.

Share. Facebook Twitter Pinterest LinkedIn Telegram Reddit Email
Previous ArticleSave $800 on this Samsung 49-inch gaming monitor and get a second monitor free
Next Article Soundcore demos AI-powered translation tech at Microsoft Build 2025

Related Articles

Kentucky’s Bitcoin Boom Has Gone Bust

23 May 2025

Microsoft Build summary: 4 big announcements you’ll want to know

23 May 2025

The Best Webcams for Looking Brighter and Better

23 May 2025

The Switch 2’s most important launch game isn’t Mario Kart World

23 May 2025

The WIRED Travel Tech Guide to Family Vacation Harmony

23 May 2025

NYT Mini Crossword today: puzzle answers for Friday, May 23

23 May 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo

Subscribe to Updates

Get the latest tech news and updates directly to your inbox.

Don't Miss

Microsoft Build summary: 4 big announcements you’ll want to know

By technologistmag.com23 May 2025

Microsoft Build 2025 is almost at an end. Microsoft’s annual developer conference might be aimed…

Elden Ring Live-Action Movie In The Works With Ex Machina, Annihilation Director Alex Garland

23 May 2025

Acer Swift Neo WIth Intel Core Ultra 5, Up to 32GB RAM Launched in India: Price, Specifications

23 May 2025

Xiaomi XRING O1 Die Shot Reveals Details of 10-Core CPU, 6-Core NPU and More

23 May 2025

The Best Webcams for Looking Brighter and Better

23 May 2025
Technologist Mag
Facebook X (Twitter) Instagram Pinterest
  • Privacy
  • Terms
  • Advertise
  • Contact
© 2025 Technologist Mag. All Rights Reserved.

Type above and press Enter to search. Press Esc to cancel.